Understand in 3 minutes: How does the rotating spiral chute turn "waste slag" into "gold"?

#Industry ·2026-02-17

Don’t let valuable metals flow away with tailings anymore! With just one rotating spiral chute, powered by the "centrifugal force-gravity" dual engine, it accurately sorts even 0.02 mm particles, boosting recovery rates by over 30% and cutting tailings grade in half. No chemicals, no noise, with a power consumption of just 1.5 kW/ton—saving hundreds of thousands in reagent costs annually. Modular assembly completes installation in 3 hours, requiring only one on-site operator. It "identifies at a glance" all metals with a specific gravity difference of 0.5 or more, including copper, gold, tin, tungsten, lead, and zinc. Place an order now and get a dedicated process solution for wear-resistant polyurethane liners, limited to the first 50 orders. Click "Call: 13970779688" to turn your tailings warehouse into a "mini profit center"! A copper processing plant in Yunnan installed three rotating spiral chutes. With an original ore grade of 0.45%, the tailings grade dropped from 0.12% to 0.06%, recovering an extra 1.7 tons of metal per month. At a copper price of 60,000 RMB/ton, this translates to monthly revenue gains of 170,000 RMB. The equipment weighs just a third of traditional spiral chutes, saving 60,000 RMB in infrastructure costs. Its built-in frequency control automatically adapts to fluctuations in ore volume and concentration, with zero downtime. The owner declared: "Installing it a day earlier means losing less money a day earlier!" Click "Get a free solution" to calculate how much your mine could earn extra annually! Are you still "watching precious metals flow away" with traditional jigging and shaking tables for fine particles? The rotating spiral chute’s 6G centrifugal force rotates 360° to "fling" even 0.02 mm fine metals into the concentrate outlet, boosting recovery rates by 20–50 percentage points and ensuring reliable recovery of fine gold, platinum, and palladium. With full machine sealing and no on-site dust, it reduces wastewater by 70% and passes environmental inspections with ease. Support for "trial before payment" – test it on-site in just 1 hour, see the results, and sign the contract if satisfied! Book a trial now—you’ll be the next to show off your recovery rates!

Related tags:: bews tags news

© 2011-2024 Jiangxi Mingxin Metallurgical Equipment Co., Ltd